Project Overview

This is a Groundworks/Drainage Substructure and Podium slab project for Osborne Construction. This proved a challenging project due to the tight nature of the site and the sand/silt condition of the ground. Groundforce Shorco Temporary support systems had to be utilised.

The ground floor was an asphalt car park and the first floor was a podium transfer slab. We are currently working on the external drainage and finishes.

This includes, tarmac, street lighting, paving, bed planters, kerbing and footpaths.

Main Contractor

Osborne Construction Ltd

Contract Value

£1,400,000.00

Time Scale

40 Weeks

Architect

PRP Architects

Engineer

Tully D'ath