Location : Birkenhead, Liverpool

Principal Contractor : Graham Construction

Project Summary : 6 Blocks Containing 500 Apartments

Contract Value : £17m

Wirral Waters

Scope:

  • Supply and Install of Piling Matt/Pile Attendance/Pile Cropping

  • MFR Ltd(Plant and Logistics) - Supply, Install and Operation of 3 Saddle Jib Tower Cranes

  • Groundworks/Drainage and Substructure Reinforced Concrete Works

  • 6 R.C Frames - Post Tensioned Suspended Slabs

  • Loading Out Toilet Pods/Metsec/Plasterboard for follow on trades

  • Midwest Precast Ltd - Design, Supply and Install of Precast Columns/Twinwall Stair Cores and Lift Shafts and PCC Staircases/Landings